Galvanised steel frame components for a temporary building
Advice

Where to Start

Most enquiries begin with three questions: will planning permission be required, is it better to hire or buy, and what will determine the delivery programme?

The answers depend on the site and intended use. Reviewing them before approaching suppliers leads to a clearer brief, a more useful quotation and better-defined responsibilities.

Our guides explain the factors behind each decision and highlight the information worth gathering at the start.

Latest guides

Browse the latest guidance

Filter the articles by the decision you are working through, from planning and cost to specification and installation.

Who they are for

Who These Guides Are Written For

The same project raises different questions for operations, finance, procurement and delivery teams. These guides are organised to help each reader find the information relevant to their role.

Operations and Site Managers

Practical guidance on access, door sizes, floor loading, drainage and the effect of the building on day-to-day site operations.

Finance and Procurement

How hire and purchase are treated, what a quotation includes and how to compare suppliers on a consistent basis.

Consultants and Main Contractors

Programme, permitted development routes, temporary works interfaces and reinstatement obligations at the end of a contract.

Anyone Comparing Suppliers

A checklist of useful questions for assessing scope, assumptions, exclusions and delivery responsibilities before you appoint a supplier.

If a question is not covered here, ask it and we will answer it directly, and the good ones become guides. For temporary building advice on a specific requirement, see the full range of temporary industrial buildings or send us the span and length you are working to.

Request a Quote
The brochure

Download the Noah brochure

Explore the building systems we supply, the main specification choices and what to expect from installation.

  • Plan the space. A practical guide to span, length and eave height before you brief the project.
  • Compare specifications. Insulation, cladding, doors and access, with the purpose of each option explained.
  • Share it with your team. A single PDF for colleagues in operations, finance and procurement.
  • Prepare the site. The key points on groundworks, access and the scope of a quotation.

We send the brochure by email, and nothing else unless you ask.

A white steel-framed temporary building with a PVC roof
Pricing

Request a quote

Send us the approximate dimensions, postcode, intended use and likely duration. We can prepare an initial figure without a site visit.

  • Hire and purchase compared. Both options are priced against the same brief, so you can compare them properly.
  • Built around your specification. The figure reflects the size, insulation, access and intended use of your building.
  • An indicative programme. We include the likely project sequence alongside the initial cost.
  • No obligation. Use the quotation to review the project internally and come back when you are ready.
Hire or buy?

We will contact you about your request. Survey dates are arranged with you, and pricing is confirmed against the site and agreed specification.

Good to know

Frequently asked questions

Do You Need Planning Permission for a Temporary Building?

Often. The commonly cited 28-day rule is not a reliable assumption for most industrial sites.

Class B of the General Permitted Development Order allows land to be used for a temporary purpose for up to 28 days in a calendar year, together with a moveable structure supporting that use. However, the right is expressly excluded where the land is a building or lies within the curtilage of one. This rules out many industrial yards beside existing units.

Two routes usually are. Part 4 Class A covers buildings required temporarily in connection with construction operations, for the duration of those operations. Part 7 Class H covers industrial and warehouse development on land already in industrial use, within defined floor area, height and boundary limits.

Beyond those, it is a planning application, often for a temporary permission with an end date. Read planning permission for a temporary building for the detail, and take advice on your own site.

Is It Cheaper to Hire or Buy a Temporary Building?

Duration is a major factor, but capital availability, site tenure and the commercial terms also influence the decision.

Over a short requirement, hire is normally the cheaper route in cash terms, and it carries the residual value risk for you. There is a point beyond which cumulative hire payments start to exceed the purchase price, and past it you are effectively renting something you could own. If a requirement is clearly permanent, buying is usually the better commercial answer from the outset.

Where both routes are available, ask for them to be priced against the same specification. Any option to move from hire to ownership should be confirmed in the commercial terms at the outset.

Compare temporary building hire against temporary buildings for sale over the timescale you expect to use the space.

How Long Does a Temporary Building Take to Install?

The programme is confirmed for each project and includes design, manufacture, site preparation and installation.

Groundworks, access for delivery vehicles and lifting equipment, services and planning can all affect the start date. Establishing these requirements early is the best way to keep the project moving.

Tell us when you need the space and we will include an indicative programme with the quotation, together with the dependencies most likely to affect your site.

How Do You Work Out the Span and Height You Need?

Start with the usable layout and the largest equipment or vehicles that will move through the building.

Span is fixed at manufacture, so a building that turns out too narrow cannot be widened. The fix is a second building, which is why width is worth arguing about before you order. Length is the opposite: it is built from repeated bays, so it can be extended afterwards, which makes buying slightly longer than today's requirement a reasonable hedge.

Clear height is set by the tallest thing that has to move through the building rather than sit in it. A vehicle on a low-loader, a reach truck at full lift, a tipping body or a crane hook all need more than their static dimensions suggest.

Use the largest item, its transit dimensions and the way it moves once inside as the basis of the brief. See clear span buildings for more on how the dimensions are specified together.

See all frequently asked questions